Coffee Development Programme in North Eastern Region: Water Augmentation
The Coffee Development Programme in North Eastern Region supports water augmentation for coffee cultivation through subsidies.
Key facts
| Benefit | 75% subsidy, max ₹1.25 lakh |
|---|---|
| Who | Tribal growers |
| Eligibility | No previous subsidy for water augmentation |
| Documents | Application, invoice, work completion report |
| Implemented by | Coffee Board, Ministry of Commerce |
| Official portal | coffeeboard.gov.in |
| Application window | Open all year for eligible farmers to apply. |
Benefits
Beneficiaries can receive a subsidy covering 75% of the costs for water harvesting and irrigation equipment, with a maximum limit of ₹1,25,000 for all related activities combined.
Who can apply
- For: farmer
- tribal grower
- no previous subsidy for water augmentation
- land records in beneficiary name
Eligible applicants must be tribal growers who have not previously received a water augmentation subsidy during the XII plan period. Additionally, land records must be in the beneficiary's name and certified by the appropriate authorities.
How to apply
Applications must be submitted offline with the required documents in the prescribed format.
- Submit the application in the prescribed format in duplicate.
- Include the original invoice or bill with TIN No. for sprinkler or drip equipment.
- Provide a work completion report and expenditure statement signed by the applicant.
- The Extension Officer will review the documents and conduct a field inspection.
- The Joint Director or Deputy Director will review the application and approve the subsidy if eligible.
- Upon approval, the subsidy will be released via Electronic Fund Transfer (EFT).
Documents required
- Application in the prescribed format (in duplicate)
- Original invoice/bill with TIN No. for sprinkler/drip equipment
- Work completion report and expenditure statement signed by the applicant
Common problems and how to fix them
| Problem | What to do |
|---|---|
| Application rejected | Ensure all required documents are submitted in the prescribed format and that land records are certified. |
| Payment not received | Check with the Joint Director or Deputy Director (Extension) regarding the status of your subsidy claim. |
Frequently asked questions
What is the main goal of the Coffee Development Programme in North Eastern Region?
The scheme aims to enhance coffee productivity and quality by establishing infrastructure for water augmentation, which supports irrigation and wet processing.
Who qualifies to apply for this subsidy?
Applicants must be tribal growers without prior water augmentation subsidies during the XII plan period and must have certified land records in their name.
What types of activities are eligible for subsidy under this scheme?
Eligible activities include the installation of water storage tanks, open wells, and irrigation systems such as sprinklers or drip equipment.
What is the subsidy percentage for water harvesting structures?
The subsidy is 75% of the unit cost, with a maximum cap of ₹1,25,000 for all related activities combined.
Where should the water augmentation structures be located?
Water augmentation structures must be situated on the estate or in its vicinity to qualify for the subsidy.
Can subsidies for water harvesting and irrigation equipment be claimed at different times?
Yes, growers can claim subsidies for water harvesting structures and irrigation equipment either simultaneously or at different times.
Always confirm the latest details on the official portal before applying.
Comments
Loading…